Bond 2022 Updates
Completed Projects
Projects that have been completed thus far include:
The wooden fence at the bus garage entrance was torn down and replaced with a privacy chain link fence
Two (2) new lawn mower were purchased
Upgraded some technology - more to do still
Upgraded some HVAC - more to do still
Upgraded water drainage in the HS courtyard
New tile installed in the elementary gym
New gutters installed on the south side of the varsity gym
Awnings/facings changed from maroon to Capac blue
New gym floor installed in the Harry C. Moore Memorial Gym (varsity gym)
New bell system - this was actually funded by using a Michigan State Police Safety Grant and thus saved spending bond dollars on this item
Proposed Projects
Bond 2022 projects that are being put out for bids this fall include:
FFA Barn
Elementary
Parking Lot - this will be done late fall of 2024. This is the parking lot South of Kempf Court street.
Casework (counters/cabinets) - lower elementary school.
Includes sinks
Doors/Hardware
Office - remodel the entire office space
Tile for elementary hallways
Green/white tiles changed to blue/gold tiles
Jr.-Sr. High school
JV gym sanded and repainted to match varsity gym
Doors/Hardware - mostly in the 200 & 300 hallways
Jr Hi lockers removed and replaced. These will be blue in color, not maroon
Awnings for CVEP and Admin entrances to match the Jr/Sr High School awning
District
North Ditch - will have a tile in it and leveled off
PressBox - will be extended upward with a second story and windows added to the north side for soccer games
Ticketbooth - a new, permanent, ticket booth will be built along with some cement work for foot paths for guests.
Baseball dugouts - all of the baseball dugouts will be closed in
Other bond upcoming bond projects
Window treatments throughout the District
Furniture for Elementary and Jr.-Sr. High
Studio lights for the art room
Clocks
Storage for band
LED lights for the stage
Music Acoustic Clam for stage
Jr. High coaches locker rooms updated
Digital Road signs